Skip to main content
                                                                                              

Division 11 - Equipment - Master Specifications / Design Guidelines 


DISCLAIMER:  These master specifications/design guidelines are intended for use by consultants to the State of Wisconsin and by others for construction and remodeling of State owned facilities. The State of Wisconsin bears no liability nor responsibility for any other use of these specifications.

All *.docx documents listed below are Microsoft Word 2010 format. To download a file directly to your computer from the site, right click on the file and choose "Save Target As".  Some browsers may not open .docx files directly but will require you to save the document before viewing it due to security settings.  For instructions for changing the security settings to enable you to open the files directly in IE8 click IE8 Sec Ins.pdf.

Please Note:  If you wish to download multiple files from this master specification, you may do so by going to the DOA FTP Site.  This FTP area is setup for anonymous use.  You will need to use an FTP Client or after clicking on the DOA FTP Site link above, follow the instructions at the top of the ftp page to Open FTP Site in Windows Explorer to download multiple files.

Equipment - Design Guidelines - Division  11
File Name File Title Rev. Date
Equip Design Std.docx Equipment Design Standards  10/1/2012

Equipment - Master Specifications - Division  11
File Name File Title Rev. Date
11 08 00.docx Commissioning of Equipment 2/27/2015
11 53 13.docx Laboratory Fume Hoods 5/6/2016